Numerical Simulation and Support Scheme Optimization of Thin-roof Tunnel Considering Blast-induced Damage
摘要
在山岭隧道开挖过程中,薄基岩顶板受爆破动力影响围岩损伤较为显著,且顶板厚度沿开挖方向逐渐增大,然而现有支护方案未能针对不同顶板厚度的断面进行差异化设计.为此,以青岛唐山路隧道为工程背景,基于围岩开挖爆破主频率衰减过程定义损伤变量,建立了爆破损伤与爆心距之间的函数关系,从而量化爆破对顶板围岩的损伤程度.基于离散元软件3DEC,通过弱化岩体力学参数的方法,实现了 9导坑、5断面连续爆破开挖过程的三维数值模拟,为支护方案优化设计提供依据.研究结果表明:顶板较薄的断面1和断面2的拱顶开挖使拱顶沉降值增加了 10 mm,并且这两个断面受后续开挖的影响仍然较大,最终的拱顶沉降值都超过了 60 mm;拱顶处的锚索很好地发挥了锚固作用,抑制了拱顶处的围岩沉降,断面1、2拱顶处更换锚索后,拱顶沉降减少了 10 mm左右;不同支护方案拱顶沉降曲线均在顶板厚度约7.4 m时曲率突增,该顶板厚度即为隧道安全阈值.基于数值模拟结果进行支护设计参数优化,提出薄顶板隧道断面采用锚杆+锚索的联合支护形式,较厚顶板隧道断面以单层初支为主的支护方案.通过数值模拟结果和现场应用监测反馈显示,不同顶板厚度隧道断面拱顶沉降均稳定在45 mm,表明提出的支护方案可有效控制不同顶板厚度隧道围岩的稳定性.
During tunnel excavation,blasting dynamics cause substantial damage to surrounding rock mass in thin bedrock roof conditions,while roof thickness progressively increases along the advancing direction.Current sup-port schemes lack differentiated designs to accommodate varying roof thicknesses across tunnel sections.Focused on the Qingdao Tangshan Road Tunnel,this study defined a damage variable through dominant frequency attenuation a-nalysis during blasting excavation of the surrounding rock mass.A quantitative relationship between blasting damage and the distance to the blast center was established to assess the severity of roof rock damage.Using 3 DEC discrete element software,a three-dimensional numerical simulation of the continuous blasting excavation process for 9 pilot tunnels and 5 sections was conducted,with rock mass mechanical parameters adjusted to generate critical data for support system optimization.The research findings indicate that arch crown excavation in sections 1 and 2 with thin-ner roof thickness resulted in a 10 mm increase in arch settlement values.These sections remained significantly af-fected by subsequent excavation activities,ultimately exhibiting final arch settlements exceeding 60 mm.The arch crown anchor cables demonstrate effective anchoring performance,successfully controlling surrounding rock settle-ment.After reinforcement replacement in sections 1 and 2,arch crown settlement reduced by approximately 10 mm.All support schemes exhibit abrupt changes in curvature in settlement curves at the critical roof thickness of 7.4 m,which is identified as the tunnel safety threshold.Numerical simulations guided optimized support parameters,yield-ing a combined bolt-anchor cable system for thin roof sections and single-layer initial support for thick roof sections.Both simulation and field monitoring confirm stabilized arch crown settlements at 45 mm across varying roof thicknes-ses,validating the scheme's effectiveness in maintaining tunnel stability.