军事知识服务平台
基于试井及多源数据约束的断层识别及封闭性评价方法
Identification of Faults and Their Sealing Capacity Constrained by Well Test and Multi-Source Data
摘要 为了有效解决油田开发阶段因断层认识偏差导致的注水注气效果不佳、气窜等问题,并针对静态地震勘探技术在开发阶段断层识别及封闭性评价方面的局限性,本文建立了以压力恢复试井、注入压降试井、干扰试井为核心手段,以注采数据、地震资料、示踪剂等多源信息为约束资料的断层识别及封闭性评价方法,并在断层发育的 JLT 油田 JH2X 区块开展应用.研究结果表明:①在开发阶段,以单井压力恢复试井、注入压降试井及井组干扰试井为主要手段的试井技术,能够精准识别油气藏中的小尺度断层、隐伏断层,并动态评价断层封闭性随油气生产变化特征;②多源数据约束通过曲线拟合、方法互证、多源数据验证3种途径极大降低了试井解释的多解性,显著提升了评价的精准度;③本文方法在 JH2X 区块地震剖面解释断层与生产相矛盾的区域开展精细评价,精准描述了区块断层展布及其封闭性,修正了原有断层认识,为开发方案调整提供了数据支撑.结论认为,基于试井及多源数据约束的断层识别及封闭性评价方法是油气藏开发阶段断层精细评价的有效手段,不仅成功解决了 JH2X 区块的开发难题,还为同类断块油气藏断层精细刻画提供了技术参考,具有广泛的应用前景和推广价值.
Abstract:
To effectively solve problems such as poor water and gas injection performance and gas channeling caused by inaccurate fault understanding during oilfield development,and to address the limitations of static seismic exploration technology in fault identification and sealing evaluation during the development stage,this paper establishes a fault identification and sealing evaluation method that uses pressure buildup well testing,injection falloff well testing,and interference well testing as the core means and is constrained by multi-source information such as injection-production data,seismic data,and tracers.The method is applied in the JH2X block of the JLT oilfield,where faults are well developed.The results show that:①During the development stage,well testing technologies mainly consisting of single-well pressure buildup testing,injection falloff testing,and well-group interference testing can accurately identify small-scale and concealed faults in hydrocarbon reservoirs and dynamically evaluate how fault sealing capacity changes with oil and gas production.②Multi-source data constraints greatly reduce the non-uniqueness of well test interpretation through three approaches—curve fitting,mutual verification of methods,and multi-source data verification—thereby significantly improving evaluation accuracy.③The proposed method is used to conduct fine evaluation in areas of the JH2X block where faults interpreted from seismic sections contradict production performance.It accurately described the fault distribution and sealing capacity in the block,revised the previous fault understanding,and provided data support for development plan adjustment.It is concluded that the fault identification and sealing evaluation method based on well testing and multi-source data constraints is an effective means for fine fault evaluation during hydrocarbon reservoir development.It not only successfully solves the development challenges in the JH2X block but also provides a technical reference for fine fault characterization of similar fault-block hydrocarbon reservoirs,with broad application prospects and value for extension.
刊 名 测井技术 ISTIC
年,卷(期): 2026, 50(5)
分类号: P631.84
机标分类号: TE373 P631.4 TE122.2+3
在线出版日期: 2026年11月9日
基金项目: 25ZYCJSG010:中国石油集团测井有限公司科技项目,