Influencing Factors of Switching Overvoltage Amplitude of Shunt Capacitors in Substation
摘要
变电站并联电容器长期承受操作过电压,可能造成电容器老化、故障,甚至击穿损坏,甚至可能导致电力系统故障并造成严重后果.针对以上问题,本研究提出了一种可以模拟断路器投切过程中电气强度恢复过程、投切随机特性和介质重燃的断路器模型,并根据变电站的无功补偿电容器组实际连接方式及回路特征,利用PSCAD软件进行了变电站仿真建模.最后,基于变电站的运行特点,本研究对并联电容器投切过程中过电压影响因素进行了分析,如断路器分合特性对过电压的影响、不同设备安装位置对过电压的影响和不同对地电容对过电压的影响.研究结果表明,保护设备不同安装方式对过电压具有较大影响,同时,断路器开合相角、对地电容等对变电站过电压也有较大的影响.
The shunt capacitors in substation are subjected to operating overvoltages for a long time,which may lead to capacitor aging,faults,even breakdown damage.In severe cases,this can further trigger power system failures and incur serious consequences.Regarding the above issues,a circuit breaker model capable of simulating the dielectric strength recovery process,random switching character-istics and dielectric restriking during breaker switching operations is developed in this study.According to the actual connection mode and circuit characteristics,the PSCAD software is used.Finally,based on the operational characteristics of substations,the factors affecting overvoltage during the switching process of parallel capacitors are analyzed,such as the influence of circuit breaker on overvoltage,the influence of different equipment installation positions on overvoltage and the influence of different on ground capaci-tor on overvoltage.The results show that the different installation methods of protective equipment have a significant impact on overvoltage,and at the same time,the opening and closing phase angle of circuit breakers and ground capacitance also have a significant impact on overvoltage in substations.