军事知识服务平台
面向跟/构网平滑切换的VSG预同步控制策略
VSG Pre-synchronization Control Strategy for Smooth Switching Between Grid-following and Grid-forming Modes
摘要 针对并网变流器跟/构网模式切换过程中的暂态功率冲击问题,结合暂态功率冲击产生机理,提出一种面向跟/构网平滑切换的虚拟同步发电机(VSG)预同步控制策略.首先,对预同步过程相位差跳变问题进行校正,并基于相位差区间自适应调整追踪方向,优化相位追踪过程所需的相位调节量.其次,基于积分器输出一致平滑切换电流参考值,避免因直接切换引起的电流冲击,结合电压幅值预同步,有效抑制模式切换过程的暂态功率冲击.最后搭建了并网变流器实验平台并进行实验,实验结果验证了所提控制方法对抑制跟/构网切换瞬间暂态功率冲击的有效性.
Abstract:
To address the transient power impact of grid-connected converters during the switching between grid-following and grid-forming modes,and based on the generation mechanism of this transient power impact,a virtual synchronous generator(VSG)pre-synchronization control strategy for smooth switching was proposed.First,the phase difference jump problem during pre-synchronization was corrected,and the tracking direction was adaptively adjusted according to the phase difference interval,optimizing the phase adjustment amount required for phase tracking.Second,the reference current value was smoothly switched based on the consistency of integrator output to avoid current impact caused by direct switching,and combined with voltage amplitude pre-synchronization,the transient power impact during the mode switching process was effectively suppressed.Finally,an experimental platform of the grid-connected converter was built and experiments were carried out.The experimental results verify the effectiveness of the proposed control method in suppressing the transient power impact during the switching between grid-following and grid-forming modes.
刊 名 电气传动 ISTIC
年,卷(期): 2026, 56(10)
分类号: TM464
机标分类号: TM71 TM46 TM341
在线出版日期: 2026年10月28日