Reliability analysis of 1D estimation for TBM operational parameters
摘要
Accurate TBM performance estimation is essential for effective tunnel design and planning.This study introduces a one-dimensional(1D)estimation model that estimates thrust,torque,power,cutterhead speed,and tool count using only excavation diameter.The model was developed across four TBM types-open,single shield(SS),double shield(DS),and earth pressure balance(EPB)—to isolate the influence of diameter from other variables.Validation against existing models and a 52-case independent dataset confirmed strong cor-relations:torque scales with the cube of the excavation diameter(R2=0.89 for EPB),power grows faster than linearly(R2=0.83 for EPB),thrust increases supra-linearly(R2=0.79 for EPB),and cutterhead speed decreases with diameter(R2=0.87 for open TBM).Tool count grows proportionally.A reliability matrix compares model accuracy and data support,aiding selection based on both fitness and robustness.This 1D model offers fast,consistent estimates for early-stage assessments.While it excludes detailed geological input,it is suited for feasibility studies and preliminary design.Future work will incorporate additional ground and machine parameters and extend validation across a broader range of tunneling conditions to enhance generalizability.
年,卷(期):
2026, 27(2)
机标分类号:
H31
G633.410.2
TP311
在线出版日期:
2026年6月26日