深埋平行小间净距四孔隧洞开挖变形分析及施工优化研究
Deformation Analysis and Construction Optimization of Deep-buried Parallel Group Cave Excavation
摘要
针对四孔小净距隧道群施工过程中,先行施工隧洞和后行隧道掘进时相互影响作用尤为复杂的问题,以福州长乐漳港至营前段区间董奉山隧道为工程依托,采用三维有限元分析方法,研究不同隧道深度、不同隧道净距和不同隧道掌子面错距对开挖变形影响.并通过正交试验研究了围岩等级、隧道埋深、隧道净距、开挖顺序和掌子面错距对隧道稳定性影响.结果表明:在异步掘进过程中后行掘进的隧道在拱顶和仰拱中心处变形最大,一定埋深条件下围岩最大变形与埋深呈正比.隧道净距对隧道变形影响显著.掌子面错距越大,先行隧洞与后行隧洞的变形滞后现象愈发明显.先依次开挖主线隧道再开挖两侧辅线隧道,开挖错距为1.2 倍主线隧道跨度,以及多孔隧道净距均取1 倍主线隧道跨度时对多孔隧道的稳定和变形影响最小.
For the construction of four closely spaced tunnels,the mutual interference between tunnels is more complicat-ed,and the influence mechanism is difficult to determine,which makes the design and construction of the group of tun-nels difficult.Based on the project of Dong Fengshan Tunnel in the section between Changle Zhanggang and Yingqian in Fuzhou,a three-dimensional numerical model was established to analyze the effects of different tunnel depths,different tunnel clearances and different misalignments of the tunnel palisade on the deformation of the excavation.The results show that the deformation of the tunnel is the largest in the center of the arch and the superelevation arch,the maximum deformation of the surrounding rock under a certain depth condition is proportional to the depth of the tunnel,the tunnel clearance has significant effects on the deformation of the tunnel,and the greater the misalignment distance of the tunnel palm face,the lagging phenomenon of the first cave and the backward cave becomes more and more obvious.Orthogonal tests are designed to analyze the influences of surrounding rock grade,tunnel depth,tunnel clear distance,excavation sequence and palm face misalignment on tunnel stability.And results show that when the main line tunnel is excavated successively and then the auxiliary line tunnels on both sides are excavated simultaneously,with an excavation offset of 1.2 times the span of the main line tunnel and a clear distance of 1 times the span of the main line tunnel for each multi-hole tunnel,the influence on the stability and deformation of the multi-hole tunnel is the least.
年,卷(期):
2026, 24(4)
分类号:
TV554
机标分类号:
U455.4
TV554
TU457
在线出版日期:
2026年8月25日
基金项目:
202228:福建省交通运输科技项目,