Research on the Construction and Application of a Maintenance Decision-Making System for Ordinary Trunk Highways in Shaanxi Province
摘要
针对传统公路养护决策依赖经验、资金分配不合理及缺乏长期规划等问题,以陕西省普通国省干线公路为对象,提出了一套包括指标构建、性能预测与资金优化的养护科学决策方法.该方法首先融合养护历史、技术状况与地理信息等数据,构建了包含路面行驶质量指数、损坏状况指数、交通量等因素在内的多维度养护决策指标体系,采用熵权法与德尔菲法相结合的组合赋权法确定指标权重,得到养护需求指数(MNI).其次,基于时间序列加权移动平均法建立路面使用性能衰变预测模型,并通过历史数据标定模型参数.然后,针对不同决策场景,分别开发了单年度资金分配优先级排序模型和多年度资金优化模型.最后,将模型与方法集成至"陕西省公路局干线公路电子地图系统",形成具备数据管理、路况评定与养护决策可视化的科学决策平台.以 G210 国道陕西段为案例实证,结果表明:当 PCI 与RQI 权重比为 7∶3 时,预防性养护路段识别准确率达 88.2%;在 5 年规划期内,模型生成方案较传统经验决策方案提升优良路率约 7.2%,资金使用效率提高约 18%.该研究为区域公路养护管理提供了从理论方法到系统实践的全套解决方案,可为同类地区的公路养护管理提供参考.
To address the issues of experience-dependent decision-making,irrational fund allocation,and the lack of long-term planning in traditional highway maintenance practices,a scientific highway maintenance decision-making framework that encompasses indicator system construction,performance prediction,and fund allocation optimization is proposed in the paper,using ordinary national and provincial trunk highways in Shaanxi Province as the study background.The proposed method first integrates multi-source data,including maintenance history,pavement condition,and geographic information,to establish a multi-dimensional indicator system comprising the Riding Quality Index(RQI),Pavement Condition Index(PCI),traffic volume,pavement structure,and annual average rainfall.A combined weighting method integrating the entropy weight method and the Delphi method is employed to determine the indicator weights,resulting in the development of a Maintenance Necessity Index(MNI).Subsequently,a pavement performance deterioration prediction model is established based on the time-series weighted moving average method,with model parameters calibrated using historical data.For different decision-making scenarios,a single-year fund allocation priority ranking model and a multi-year fund optimization model are developed.Finally,the models and methods are integrated into the"Shaanxi Provincial Highway Bureau Trunk Highway Electronic Map System",forming a scientific decision-making platform that integrates data management,pavement condition assessment,and maintenance decision visualization.Taking the G210 national highway section in Shaanxi Province as an empirical case,the results show that when the weight ratio of PCI to RQI is 7∶3,the identification accuracy of preventive maintenance sections reaches 88.2%.Over a five-year planning horizon,the scheme generated by the model improves the proportion of roads in excellent and good condition by approximately 7.2%and increases fund utilization efficiency by about 18%compared with traditional experience-based decision-making.This study provides a comprehensive solution ranging from theoretical methodology to systematic practice for regional highway maintenance management and can serve as a reference for similar regions.