Research on the Treatment Technology of Salinized Excavated Rock Materials for Subgrade Filling
摘要
针对新疆盐渍化地区公路建设中路基开挖石料盐渍化现象突出、现有填筑处置技术难以满足路基长期稳定性要求的问题,以 S24 线鄯善至库米什高速公路第三标段第五合同段为工程依托,采用现场踏勘、代表性取样、易溶盐测试、成因机理分析等方法,对盐分来源、赋存特征、处置方案、路床控制指标等进行系统研究.结果表明:1)研究区岩体本身非盐渍化,开挖混合料盐分源自裂隙充填与风化碎屑混入,且以硫酸盐型中-强盐渍土为主,占比达62.5%;2)区域干旱少雨,地下水位埋深大,粗粒石料大孔隙结构可有效抑制毛细水上升与盐分迁移,且盐渍化发育程度呈现浅部强、深部弱的分布规律,开挖石料混合料用作路基填料具备可行性;3)采用"二次破碎+1 cm 辊轴式筛分除盐"的筛分剔除含盐细料的处置方案,可从源头控盐并保障填料稳定.
To address the issue of prominent salinization of excavated rock materials used for subgrade filling in the highway construction in salinized areas of Xinjiang,and the fact that the existing treatment technology for subgrade filling can hardly satisfy the long-term stability requirements of the subgrade,based on the fifth contract section of the third bid section of the Shanshan-Kumish Expressway of Highway S24 line,the sources and occurrence characteristics of salt,treatment scheme and roadbed control indicators were systematically investigated using the methods of field survey,representative sampling,soluble salt tests and formation mechanism analysis.The results show that:1)The rock mass in the study area is not salinized,and the salt content of the excavation mixture comes from the crack filling and the mixing of weathered debris,and the dominant type is sulfate-type medium-to-strong saline soil,accounting for 62.5%;2)The study area is dry and rainless,and the groundwater table is deep.The macropore structure of coarse-grained stone can effectively inhibit the rise of capillary water and salt migration,and the degree of salinization is higher in shallow layers and lower in deep layers,exhibiting a decreasing trend with depth.It is feasible to use the excavated rock mixture as subgrade fill material;3)The treatment scheme of"secondary crushing and 1-cm roller-type screening desalnation"for screening and removing salt-containing fine materials can control salt content at the the source and ensure the stability of the fill material.