古滑坡体挖方边坡局部变形分析及二次加固方案研究
Deformation Analysis and Secondary Reinforcement of an Excavated Slope on a Reactivated Ancient Landslide
摘要
本文以山西省沁水县某大型医院古滑坡体挖方边坡为研究对象,针对其在施工期因连续强降雨诱发局部蠕滑的工程问题,开展了变形机理分析与二次加固设计研究.通过现场勘查与监测数据反分析,揭示了边坡失稳是"坡脚开挖卸荷"与"降雨入渗软化"共同作用的结果,并确定了浅层滑移面位于碎石土与基岩界面.研究表明,原"坡脚锚索抗滑桩+放坡+锚杆框架梁"支护体系因桩前开挖导致抗力不足.在此基础上,提出了以"固脚强腰"为核心的分级支护二次加固方案,即在坡脚与坡腰分级补设桩,使其与原结构协同工作.数值模拟结果表明,加固后边坡安全系数提升至1.36,变形得到有效控制.本工程的成功处置为类似古滑坡体上的边坡工程提供了从险情识别、机理分析到协同加固的完整经验.
This paper focuses on an excavation slope located on an ancient landslide body for a hospital project in Qinshui County,Shanxi Province.The study addresses the engineering challenge of local creep sliding induced by continuous heavy rainfall during the construction period.Through field investigation and back-analysis of monitoring data,the slope failure mechanism was identified as a combined effect of excavation unloading at the toe and rainfall infiltration softening,with the shallow slip surface determined at the interface between residual soil and bedrock.The original support system,which combined toe piles,grading,and anchor frame beams,was found insufficient due to the loss of passive resistance after toe excavation.A secondary reinforcement scheme centered on the"strengthening the toe and waist"concept was subsequently proposed,involving the implementation of additional anti-slide piles at the slope toe and mid-slope to work in concert with the existing structures.Numerical simulation results demonstrate that the safety factor of the reinforced slope increased to 1.36,with deformations effectively controlled.The successful treatment of this case offers a valuable reference for similar slope engineering projects on ancient landslide bodies,encompassing hazard identification,mechanism analysis,and synergistic reinforcement.
年,卷(期):
2026, 42(4)
分类号:
U419.3
机标分类号:
U445.4
TU338
TG407
在线出版日期:
2026年9月21日