超大型场馆屋面系统更新改造施工技术研究
RESEARCH ON CONSTRUCTION TECHNOLOGY FOR ROOF SYSTEM RENOVATION OF SUPER-LARGE VENUES
摘要 以武汉某大型场馆屋面改造工程为研究对象,针对原排水系统瘫痪、多屋面交接节点渗漏、排气系统缺失及运营期施工受限等突出问题,提出"分区评估、分类治理、防排结合、刚柔互补"的改造策略.引入层次分析法对全面翻新与分区优化增强两种方案进行量化比选,确定后者为最优实施路径.重点研发了非穿透式侧向平衡排气系统,基于水蒸气扩散理论确定了排气管网最优间距(4~6 m),并通过水力安全计算验证了其防倒灌性能.工程实施后,经多次特大暴雨检验实现零渗漏,实测数据表明新型排气系统可有效降低防水层下界面温度 5.8℃、消除起鼓问题.本研究形成了一套针对超大型复杂屋面改造的系统性技术解决方案,可为同类工程提供理论与实践参考.
Abstract:
Taking the roof renovation of a large-scale venue in Wuhan as the research object,this study addressed critical issues such as the failure of the original drainage system,leakage at multi-roof intersection nodes,the lack of a ventilation system,and operational construction constraints.A renovation strategy of"zoned assessment,classified treatment,combined drainage and waterproofing,and rigid-flexible complementarity"was proposed.The analytic hierarchy process(AHP)was introduced to quantitatively compare two schemes,comprehensive renovation versus zoned optimization and enhancement,identifying the latter as the optimal implementation path.The development of a non-penetrating lateral balance ventilation system was developed.Based on water vapor diffusion theory,the optimal spacing for the ventilation pipe network was determined to be 4 m to 6 m,and its anti-backflow performance was verified through hydraulic safety calculations.Post-implementation,the project achieved zero leakage after being tested by multiple torrential rainstorms.Field measurements indicate that the novel ventilation system effectively reduces the interface temperature beneath the waterproof layer by 5.8℃ and eliminates blistering.This study establishes a systematic technical solution for the renovation of super-large complex roofs,providing both theoretical and practical references for similar projects.
刊 名 建筑技术
年,卷(期): 2026, 57(20)
分类号: TU746.3
机标分类号: TU746.3 TU392.5 U416.216
在线出版日期: 2026年10月30日