军事知识服务平台
基于三维成本模型的露天铁矿环境—经济协同优化研究
Research on environmental-economic collaborative optimization of open-pit iron mines based on three-dimensional cost model
摘要 以某向斜构造沉积型露天铁矿为研究对象,针对铁矿床非均质性突出、环境成本外化严重、开采与生态保护矛盾尖锐等行业痛点,创新性构建融合环境成本(碳排放、生态服务价值损失、重金属污染治理)、闭矿成本(矿山复垦、地质灾害治理)和社会成本(居民搬迁补偿、基础设施配套)的三维综合成本模型.通过10 m × 10 m × 10 m精细块体建模与克里金空间插值技术,精准表征铁矿床厚度、品位、硫磷含量等核心参数的空间异质性特征,并采用改进型智能聚合算法将模型升级为50 m × 50 m × 50 m宏块单元,在保持地质刻画精度的前提下实现运算效率提升320%.研究结果表明:环境整合方案(案例B)通过品位—环境成本等效转换与动态经济模型优化,使项目净现值(NPV)提升27.3%,内部收益率(IRR)提高4.8个百分点;年度矿石提取量优化减少6.7%,废物/矿物比峰值波动幅度降低59.2%;铁矿质量指标(铁品位≥62%、硫含量≤0.35%、磷含量≤0.12%)完全符合GB/T 25943-2021《铁矿质量分级》国家标准要求;蒙特卡洛模拟(10 000次抽样)显示,在P25、P50、P75三种价格情景下,项目NPV波动幅度均小于13.8%,展现出优异的市场风险抵御能力.本研究提出的三维成本模型与多目标优化算法,为露天铁矿绿色开发提供了经济效益、生态保护与社会责任协同推进的科学决策框架,对推动铁矿资源开发可持续发展具有重要的理论价值与工程实践意义.
Abstract:
Takes a synclinal structural sedimentary open-pit iron mine as the research object.Aiming at the industry pain points such as prominent heterogeneity of iron ore deposits,serious externalization of environmental costs,and sharp contradictions between mining and ecological protection,an innovative three-dimensional comprehensive cost model is constructed,integrating environmental costs(carbon emissions,loss of ecological service value,heavy metal pollution control),mine closure costs(mine reclamation,geological hazard control)and social costs(residential relocation compensation,infrastructure supporting).Through 10m× 10m× 10m fine block modeling and Kriging spatial interpolation technology,the spatial heterogeneity characteristics of core parameters such as thickness,grade,sulfur and phosphorus content of iron ore deposits are accurately characterized.The improved intelligent aggregation algorithm is used to upgrade the model to 50 m × 50 m × 50 m macro-block units,realizing a 320%improvement in computational efficiency while maintaining geological characterization accuracy.The research results show that:through the grade-environmental cost equivalent conversion and dynamic economic model optimization,the environmental integration plan(Case B)increases the net present value(NPV)of the project by 27.3%and the internal rate of return(IRR)by 4.8 percentage points;the annual ore extraction volume is optimally reduced by 6.7%,and the peak fluctuation range of waste/mineral ratio is reduced by 59.2%;the iron ore quality indicators(iron grade≥62%,sulfur content ≤0.35%,phosphorus content ≤0.12%)fully meet the requirements of the national standard GB/T 25943-2021"Iron Ore Quality Classification";Monte Carlo simulation(10 000 samplings)shows that under the three price scenarios of P25,P50 and P75,the fluctuation range of project NPV is less than 13.8%,showing excellent market risk resistance.The three-dimensional cost model and multi-objective optimization algorithm proposed in this study provide a scientific decision-making framework for the green development of open-pit iron mines,which promotes the coordination of economic benefits,ecological protection and social responsibility,and has important theoretical value and engineering practical significance for promoting the sustainable development of iron ore resource development.