长钢铁前系统降低生铁成本的技术措施初探
Technical measures for lowering the production cost of iron in the ironmaking system of Changzhi Steel
摘要
长钢铁前系统在追求极低生铁成本冶炼方面进行实践探索,取得了良好效果,在中钢协发布的60余家钢铁企业生铁成本排名中位于前10名.这主要得益于烧结工序优化配矿,降低消耗来降低烧结矿价格;焦化工序优化配煤结构,适当放宽部分指标来降低焦炭价格;高炉工序在保持炉况长期稳定顺行的基础上,提高铁水产量,控制适宜的冶炼强度,并从优化炉料结构、降低燃料消耗、降低动力介质消耗等方面着手,降低生铁成本.生产实践表明,降低生铁成本的重点是高炉工序,烧结工序和焦炭工序的降本最终都体现在高炉工序上.
An operation practice is tried in the ironmaking system of Changzhi Steel to seek for producing iron with extremely low cost,and the result is commendable with its low cost ranking the top 10 among 60 steel producers according to the list re-leased by China Iron and Steel Association.This success is mainly attributed to(1)the optimization of ore blending recipe and reduction of energy consumption in the sintering process,which bring about lowering of sinter price;(2)the optimiza-tion of coal blending recipe and compromise in some coke indicators of the coking process,which enable lowering of coke price;(3)increase of output,control of smelting intensity,and reduction of iron cost in the blast furnace process by optimi-zing burden mix and reducing both the fuel consumption and utility consumption under the premise of ensuring long-term sta-ble and smooth running of the furnace.The production practice demonstrates that the blast furnace process is the core se-quence of iron cost reduction,because cost reduction in the sintering and coking processes is ultimately materialized in the blast furnace process.
年,卷(期):
2026, 45(4)
分类号:
TF52
TF543
机标分类号:
F272.92
TF526+.1
TS104.2
在线出版日期:
2026年9月30日