高堆积厚度下煤矸石注浆充填采空区密闭墙稳定性研究
Stability of sealing wall in goaf under high-stacking coal gangue grouting backfill
摘要 为解决煤矸石料浆采空塌陷区注浆后,高堆积厚度条件下联巷密闭墙的稳定性问题,避免密闭墙发生漏浆、坍塌等失稳事故,以曹家滩煤矿煤矸石料浆注浆充填工程为背景,采用力学理论分析与定量计算方法,研究不同料浆堆积高度下密闭墙合理厚度及其安全稳定性.研究结果表明:随着料浆堆积高度升高,密闭墙承受的侧向载荷随之升高,所需墙体厚度也随之增加;经公式计算,当料浆堆积高度大于30 m 时,砖墙无法单独作为承载结构,需配合钢筋混凝土墙共同承受料浆充填体的侧压力;矿井最大注浆堆积高度取60 m 工况下,密闭墙设计承受荷载为 1.1×104 kN,现场施工厚度2 m 的钢筋混凝土密闭墙极限承压能力可达 2.55×105 kN,墙体满足安全稳定要求;密闭墙漏浆失效的原因为顶板掏槽区域存在大量空隙与导水裂隙,浆液沿裂隙通道发生渗流泄漏.该研究成果可为煤矸石大规模注浆充填工况下密闭墙稳定性评价与结构设计提供理论支撑.
Abstract:
To solve the stability problem of the cross-cut sealing wall under high-stacking conditions after grouting in a goaf subsidence area with coal gangue slurry,and to avoid instability accidents such as slurry leakage and collapse of the sealing wall,the coal gangue slurry grouting backfill project in Caojiatan Coal Mine was taken as the background.Mechanical theoretical analysis and quantitative calculation methods were used to study the reasonable thickness and safety stability of the sealing wall under different slurry stacking heights.The results show that:(1)As the slurry stacking height increases,the lateral load borne by the sealing wall increases,and the required wall thickness also increases.(2)According to formula calculation,when the slurry filling height exceeds 30 m,the brick wall cannot serve as load-bearing structure alone and must be combined with a reinforced concrete wall to jointly bear the lateral pressure of the slurry backfill body.(3)Under the condition of a maximum grouting filling height of 60 m in the mine,the design load borne by the sealing wall is 1.1×104 kN.The ultimate compressive capacity of a 2 m thick reinforced concrete sealing wall can reach 2.55×105 kN,which meets the safety and stability requirements.(4)Leakage occurs because voids and water-conducting fractures in the roof cutting area provide seepage channels for the slurry.The research results can provide theoretical support for the stability evaluation and structural design of sealing walls under large-scale coal gangue grouting backfill conditions.
刊 名 煤炭工程 ISTICPKU
年,卷(期): 2026, 58(9)
分类号: TD823.7 TD353
机标分类号: TD853.34 TD325 TD265.4
在线出版日期: 2026年10月9日
基金项目: :中煤科工集团北京华宇工程有限公司科技项目,