Interface failure mechanisms and control methods of anchorage bodies in TBM-excavated roadways under fault influence
摘要
锚固体稳定性是煤矿巷道支护设计的关键,其失效机制直接影响围岩长期稳定与开采安全.依托中马村矿 3903 东运输底抽巷 TBM 掘进段,采用颗粒流代码(PFC)建立二维细观模型,模拟锚杆拉拔全过程,定量表征轴向/剪应力传递及裂隙类型、位置与演化.结合工程地质条件沿线发育的坚硬灰岩带-断层破碎带-软弱泥岩带,以围岩强度与锚固长度为主控变量开展对比研究.结果表明,失效主导界面受围岩强度与锚固长度共同控制:在坚硬灰岩中,短锚固以锚杆-锚固剂界面剪切破坏为主,长锚固则诱发两界面复合破坏;在软弱泥岩中,破坏主导随锚固长度增加由锚杆-锚固剂界面转向锚固剂-围岩界面.长锚固能形成多点协同约束,改善应力分布,但可能伴随局部剪切集中;短锚固则表现为端部应力集中,整体抗拔性较弱.以剪切裂隙占比、界面裂隙比例(锚固剂-围岩/锚杆-锚固剂)及失效步数作为性能量化指标,识别从单界面向复合界面破坏的阈值与位置.现场工业性试验从工程响应层面对数值结果进行了印证:在断层破碎带与软弱泥岩带,采用长锚固可使平均拉拔力较短锚固提升约 50%~55%,巷道收敛变形显著降低;而在坚硬灰岩带,长锚固提升效果有限,短锚固即可满足设计要求.研究明确了锚固长度及围岩类型/强度的主控作用机制,为多类型围岩条件下的巷道支护参数优化与失效防控提供细观依据与判据.
The stability of anchorage bodies is critical for coal mine roadway support design,and their failure mechanisms directly influence the long-term stability of the surrounding rock as well as mining safety.Based on the TBM-excavated section of the 3903 east transportation floor extraction roadway at Zhongmacun Mine,we employed Particle Flow Code(PFC)to establish a two-dimensional mesoscopic model,to simulate the entire rockbolt pull-out process and quantitatively characterize the transfer of axial/shear stresses as well as the type,location,and evolution of cracks.Considering the hard limestone zone,fault fracture zone,and weak mudstone zone developed under the geological conditions along the engineering route,a comparative study was conducted with the strength of the surrounding rock and the anchorage length as the main controlling variables.The results indicate that:The dominant failure interface is jointly controlled by the surrounding rock strength and the anchorage length.In hard limestone,short anchorage primarily leads to shear failure at the bolt-grout interface,while long anchorage induces composite failure at both interfaces.In weak mudstone,the dominant failure shifts from the bolt-grout interface to the grout-surrounding rock interface as the anchorage length increases.Long anchorage can form multi-point cooperative constraints and improve stress distribution,but may also lead to localized shear concentration.Short anchorage,however,exhibits stress concentration at the ends and weaker overall pull-out resistance.Quantitative performance indicators,such as the shear crack ratio,interface crack proportion(grout-surrounding rock/bolt-grout),and failure step count,were used to identify the threshold and location of the transition from single-interface to composite interface failure.The field industrial test provided engineering-response-based corroboration for the numerical results.In the fault fracture zone and weak mudstone zone,adopting long anchorage increased the average pull-out force by approximately 50%-55%compared to short anchorage,significantly reducing roadway convergence deformation.In the hard limestone zone,the improvement from long anchorage was limited,and short anchorage could meet the design requirements.The controlling mechanisms of anchorage length and surrounding rock type/strength were clarified,providing mesoscopic evidence and criteria for optimizing roadway support parameters and preventing failures under various surrounding rock conditions.