深埋迎采工作面覆岩结构破断演化特征及防冲控制技术研究
Fracture evolution characteristics of overburden structure and rockburst control technology for deep opposite-mining working face
摘要 针对深埋迎采工作面围岩应力扰动范围大以及冲击危险性高等问题,本文采用理论分析、数值模拟以及现场试验等方法,研究了迎采工作面覆岩结构演化特征及诱冲机理,分析了工作面的采动应力动态分布规律,提出了"缓采-减压"调控防冲技术措施,实现了迎采工作面的安全高效回采.研究表明:迎采工作面受叠加采动应力影响覆岩破断高度增大,顶板的 T、F 型结构演化以及厚硬顶板破断失稳,是造成采场围岩冲击的主要影响因素;采场围岩冲击破坏与厚硬顶板悬臂梁长度、冲击震源能量以及地应力成正比,与应力波传播距离、能量衰减系数以及临界破坏应力成反比;迎采工作面超前应力影响范围50 m,采空区应力影响范围 150 m,采动影响区内工作面端头弧形三角板以及采空区 T、F 型悬臂梁结构破断及弯曲下沉造成煤体静动载能量集聚;采取缓采降扰以及围岩减压调控法,可降低工作面采动应力叠加,调节远近场围岩结构,改善围岩应力分布特征,现场试验后工作面静动载应力值均低于临界值,确保了工作面安全回采.
Abstract:
To address the problems of large stress disturbance range and high rockburst risk in the surrounding rock of a deep opposite-mining working face,we used theoretical analysis,numerical simulation,and field tests to study the evolution characteristics of the overburden structure and the rockburst-inducing mechanism,analyze the dynamic distribution of mining-induced stress,and propose the"slow mining and pressure relief"control technology,achieving safe and efficient extraction of the opposite-mining working face.The results show that under the superimposed mining-induced stress,the fracture height of the overburden increases in the working face.The evolution of T-shaped and F-shaped structures of the roof and the fracture instability of the thick and hard roof are the main factors causing rockburst in the stope surrounding rock.The rockburst failure of the stope surrounding rock is directly proportional to the cantilever beam length of the thick and hard roof,the energy of the rockburst source,and the in-situ stress,and inversely proportional to the stress wave propagation distance,energy attenuation coefficient,and critical failure stress.The advance stress influence range of the opposite-mining working face is 50 m,and the stress influence range of the goaf is 150 m.In the mining-induced influence zone,the fracture and bending subsidence of the arc-shaped triangular plate at the working face end and the T-shaped and F-shaped cantilever beam structures in the goaf cause the accumulation of static and dynamic load energy in the coal mass.By adopting slow mining disturbance reduction and surrounding rock pressure relief control methods,the superimposed mining-induced stress can be reduced,the near and far field surrounding rock structures can be adjusted,and the stress distribution characteristics of the surrounding rock can be improved.After field tests,the static and dynamic load stress values of the working face were both lower than the critical values,ensuring safe extraction of the working face.
刊 名 煤炭工程 ISTICPKU
年,卷(期): 2026, 58(9)
分类号: TD325
机标分类号: TD353 U4 TD823.253
在线出版日期: 2026年10月9日
基金项目: 52104081:国家自然科学基金E2025402059:河北省自然科学基金,