基于熵权三角模糊层次分析法的山地风电场送出系统实时雷击风险评估
Real-Time lightning risk assessment of mountain wind farm delivery system based on EMW-TFN-AHP method
摘要
针对现有山地风电场送出系统实时评估雷击方法在时间维度上跨度较广,实时雷击防控时参考价值有限的问题,文章基于熵权法和三角模糊层次分析法(EMW-TFN-AHP),提出一种山地风电场送出线路受实时雷击风险评估方法.该方法首先运用EMW-TFN-AHP双通道模型确定各指标权重;其次,综合多维数据建立一种三层风险评估体系;最后,基于某风电场数据进行校验,完成实时风险评估.实验结果表明,在山区复杂地形条件下,该方法分类正确率为 83%,可及时反映强对流天气下山地风电场送出线路的风险状态,最大限度地保证风电场送出系统安全,性能优于传统方法.
The renewable advantages of wind energy have led to the rapid development of wind power scale.However,lightning accidents in the transmission system of mountainous wind farms can have a significant impact on the power system.The existing research methods have a wide time span,and their reference value in real-time lightning strike prevention and control needs to be improved.This paper proposes a real-time lightning risk assessment method for mountainous wind farm transmission systems based on an EMW-TFN-AHP method.Firstly,the EMW-TFN-AHP dual-channel model is applied to determine the weights of each index.Secondly,a three-layer risk assessment system is established by synthesizing multi-dimensional data.Finally,based on the surrounding data of a wind farm,calibration is performed to complete the real-time risk assessment.The experimental results show that in the face of the complex terrain of mountainous areas,the classification correct rate of the method is 83%,and the performance is better than the traditional method,which can reflect the risk status of the mountain wind farm transmission line under the strong convective weather in a timely manner,and ensure the safety of the wind farm transmission system to the maximum extent,which can effectively utilize and develop the renewable energy of mountainous wind farms.
年,卷(期):
2026, 44(9)
分类号:
TK81
机标分类号:
TP393.08
P412.25
TM773
在线出版日期:
2026年10月14日
基金项目:
4242035:北京市自然科学基金面上项目X23050:北京建筑大学培育项目51407201:国家自然科学基金,