池州长江公铁大桥主桥大型钢-混组合围堰协同受力特性分析
Analysis of Steel-Concrete Synergy in Large Steel-Concrete Composite Cofferdam for Chizhou Changjiang River Rail-cum-Road Bridge
摘要 池州长江公铁大桥主桥为主跨812m的三主桁三索面双层钢桁梁斜拉桥,3号主墩承台采用钢-混组合围堰施工,围堰平面尺寸为80.6m×52.6m,高42.75m.为揭示大型钢-混组合围堰的钢混协同受力规律,解决高水头差下围堰壁体及钢壁板设计厚度过大的问题,通过缩尺模型试验与有限元数值计算,结合试验壁体应变监测,分析结构位移与应力,并提出将受拉区混凝土拉应力转换为受拉区钢结构拉应力进行核算的设计修正方法.结果表明:试验壁体竖向位移与荷载变化总体呈线性关系,在30%~40%试验设计荷载时出现位移突变,试验壁体超出弹性受力阶段;受压区钢结构与混凝土始终弹性协同受力,卸载后恢复到加载的初始状态,在30%试验设计荷载内受拉区钢结构与混凝土协同受力,超过此荷载后混凝土破坏并逐步退出受力,受拉作用主要由钢结构承担;水平横撑整体受力较小,对结构承载贡献有限;在100%试验设计荷载时受拉区混凝土应力计算值远超其抗拉承载力,受压区钢壁板、混凝土应力计算值与试验值较为一致;采用文中提出的设计修正方法将3号主墩钢-混组合围堰壁体厚度由2.4m优化为2.2m,钢壁板厚度由14mm优化为8mm,节省钢材用量约42%.
Abstract:
The main bridge of Chizhou Changjiang River Rail-cum-Road Bridge is a cable-stayed bridge featuring a main span of 812 m.The superstructure consists of three lateral trusses that accommodate two levels of decks.The stay cables are arranged in three cable planes.The pile caps of the main piers were constructed with the assistance of a steel-concrete composite cofferdam measuring 80.6 m by 52.6 m,42.75 m in height.To reveal the steel-concrete synergy in the steel-concrete composite cofferdam and optimize the thickness of the cofferdam walls and steel walls to better address the drops in head,the scaled-down model tests and numerical simulation were conducted to analyze the displacement and stress of the structure,combined with the monitored strain data.It is proposed to convert the concrete tensile stress in the tensile zone to the tensile stress of the steel structure in the tensile zone for checking and design optimization.The results demonstrate that the vertical displacement of the cofferdam walls was,in general,in a linear relationship with the loads,and an abrupt displacement variation appeared when applied with 30% to 40% of design load,the cofferdam walls tested went beyond the elastic load bearing stage.The steel structure and the concrete in the compressive zones had always been in elastic synergy,but restored to the initial loading condition when de-loaded.The steel structure and concrete in the compression zone were in the synergy when loaded by 0-30% design loads,once beyond the 30% design loads,the concrete began to damage and gradually lost load bearing capacity.The steel structure was the main tensile strength contributor.The horizontal bracings shared a limited portion in the overall load bearing capacity of the structure.When applied by 100% design loads,the calculated stresses in the concrete in the tensile zones were far greater than the tensile strength of the concrete,while the stresses in the steel walls and concrete in the compression zones agree with the measured values.The wall thickness of the steel-concrete composite cofferdam of main pier No.5 is optimized from 2.4 m to 2.2 m,the thickness of steel walls is reduced from 14 mm to 8 mm,leading to 42% cut in steel consumption.
刊 名 桥梁建设 ISTICEIPKU
年,卷(期): 2026, 56(4)
分类号: U448.27 U443.162
机标分类号: U448.27 TU391 TU473.1
在线出版日期: 2026年9月7日