摘要 乌蒙山大桥主桥为计算跨径270m的钢桁腹杆-混凝土组合拱桥,桥面采用预制T梁,主拱圈及T梁均采用缆索吊装法进行施工.由于桥址位于喀斯特峡谷地貌区,施工场地受限且需兼顾左、右幅主桥及引桥吊装作业,该桥提出可横移式大吨位无塔架缆索吊装系统.该系统由锚碇系统、缆索系统、动力系统及新型横移系统等构成,仅在空载状态下进行横移,设计吊重300t,跨度742m,主索直接锚固于两岸山体,取消塔架设计.新型横移系统采用滑块自平衡横移智能同步控制技术,通过穿心式千斤顶张拉精轧螺纹钢带动滑块横移,结合多模式同步控制、可视化监测等功能,将多点横移同步误差控制在1cm以内.施工过程中对缆索吊装系统进行分阶段试横移与针对性偏差调控,显著提升了施工效率、安全性与协同性.利用该系统,成功完成乌蒙山大桥主、引桥吊装作业,可为山区大跨度拱桥缆索吊装提供参考.
Abstract:
The Wumengshan Bridge is a deck-type arch bridge with an arch span length of 270 m,featuring the steel truss web-concrete composite arch(the combination of steel-truss web members and concrete top and bottom slabs).The deck system is formed of prefabricated T girders.The steel truss web-concrete composite arch and the T girders were constructed by the large-tonnage cableway crane,which is capable of transverse moving and has no towers,to facilitate the construction of the bridge in the Karst region.The limited construction site and synchronized construction of the left and right bridges as well as the main and approach bridges made the construction quite challenging.The cableway crane consists of an anchorage system,cableway system,dynamic system,and a novel transverse moving system,which just moves with empty crane.The design capacity of the cableway crane is 300 t,moving in a distance of 742 m.The main cables were directly anchored to the hills,thus requiring no towers.The transverse moving system relies on the sliders to achieve the intelligent transverse moving control,the center hole jacks are used to stress the screw thread steel bars to drive the transverse moving of the sliders,and the multi-point transverse moving error is controlled within 1 cm via different ways of synchronized control and visualized monitoring.During construction,the cableway crane needed trial transverse moving and deviation control at different stages,to improve the construction efficiency,safety and collaboration.The system successfully completed the construction of the main and approach bridges of Wumengshan Bridge,which offers technical insights into the construction of long-span arch bridges in mountainous areas.
刊 名 桥梁建设 ISTICEIPKU
年,卷(期): 2026, 56(4)
分类号: U448.22 U445
机标分类号: U448.22 TP311.52 TU746.5
在线出版日期: 2026年9月7日