摘要
为提高大跨钢-混组合梁桥施工的装配化程度和经济性,提出一种新型施工方法,即首先采用架桥装备架设整孔钢梁;然后通过架桥装备进行多点提拉,安装预制桥面板并浇注湿接缝混凝土;最后待湿接缝混凝土达到设计强度后再卸载提拉力.针对该施工方法,基于钢-混组合梁与架桥装备协同受力计算模型进行协同设计,计算提拉效率和用钢量,分析钢梁架设和整孔提拉的可行性、适用性;依据协同设计的结果,以国道207孟州至偃师黄河大桥和兰原高速东坝头黄河大桥为背景,进行实桥设计与协同设计对比分析.结果表明:架桥装备能够施加相当于自身重量4倍的提拉力;当架桥装备主桁承载能力不由外部荷载主导时,常规架桥装备适用于跨径不超过110m的钢-混组合梁桥架设;大跨钢-混组合梁的合理提拉效率为0.64~0.83,此时提拉与完全不提拉情况下的用钢量比值为0.66~0.74;协同设计成果可用于快速评估架桥装备整孔架设钢-混组合梁的技术可行性和经济性.
This paper presents a new construction method,aiming to improve the prefabrication degree and economy.First,the steel girders in a span are assembled to be an entirety for erection to achieve the span-by-span erection of the superstructure.Secondly,the exact girder erection crane is used for the erection of the prefabricated deck slabs via multi-point lifting,and the in-situ joints are cast.Once the concrete strength of the in-situ joints reaches the design strength,the lifting forces are released.The collaborative performance of the steel-concrete composite girder and girder erection equipment is modelled for collaborative concept design,calculate the lifting efficiency and steel consumption,analyze the feasibility of the steel girder erection and full-span lifting.The Mengzhou-Yanshi Huanghe River Bridge carrying a section of the National Highway 207 and the Dongbatou Huanghe River Bridge carrying a section of the Lankao-Yuanyang Expressway are used for a case study.A comparative analysis of the actual bridge design and conceptual design was conducted.The results demonstrate that the girder erection equipment gives a lifting force that is 4 times of its self-weight.When the load bearing capacity of the truss of the girder erection equipment is not dominated by external loads,the conventional girder erection equipment is applicable to the erection of the steel-concrete composite girder bridge with span lengths less than 110 m.The rational lifting efficiency of the long-span steel-concrete composite girder is between 0.64 and 0.83,in this case,the ratio of the steel consumption in the lifting scenario and the steel consumption in the non-lifting scenario is between 0.66 and 0.74.The conceptual design achievements can be used to rapidly evaluate the technical feasibility and economy of the girder erection equipment in the construction of the steel-concrete composite girder.
年,卷(期):
2026, 56(4)
分类号:
U448.216
U442.5
机标分类号:
U445.7
TU528
TU391
在线出版日期:
2026年9月7日