基于零位移法的拱桥斜拉扣挂施工索力迭代优化计算方法研究
Calculation Method for Cable Force Iterative Optimization During Cable-Stayed Cantilever Construction of Arch Bridge Based on Zero-Displacement Method
摘要 为准确计算拱桥斜拉扣挂施工过程中的扣锚索索力,防止多次张拉造成扣锚索松弛,提出一种基于零位移法的斜拉扣挂施工索力迭代优化计算方法.该方法以控制点位移为0为目标、以索力调整为辅,将结构因自重变形而产生的扣锚索索力作为初始索力,对索力对应控制点位移进行验算,经迭代得到最终索力,使主拱线形逐渐接近设计线形.为验证该方法的可行性,以广州明珠湾大桥主桥(斜拉扣挂系统设置3层扣锚索)为背景,采用该方法计算3层扣锚索索力,与索力设计值、实测值进行对比,并对3层扣锚索张拉后扣塔变形进行分析.结果表明:通过该方法得到的索力计算值接近实测值,而大于设计值,较设计索力偏安全,在确保结构安全的同时具有较好的计算精度,验证了该方法的可行性;各控制点位移计算值与实测值均满足规范要求,结构整体偏安全;在3层扣锚索张拉后,扣塔顶端偏位均满足规范要求,该方法既可实现主拱线形调整,又能保证扣塔变形处于允许范围内.建议在设计阶段对主拱进行预抬,使结构线形更贴合设计线形.
Abstract:
To accurately calculate the forestay and backstay forces(thereafter the stay forces for short)during the cable-stayed cantilever construction of the arch bridge and prevent slacking of the forestays and backstays,a calculation method for stay force iterative optimization based on the zero-displacement method is proposed.Aiming to achieve zero displacement at control points,the method takes the stay forces triggered by the self-weight induced deformation of the structure as initial input,assisted by stay force tuning,to verify the displacement at corresponding control points of stay forces,and iteratively determine the final stay forces to align the main arch profile with the designed alignment.The method has been applied to the calculation of the forces of three layers of forestays and backstays of the cable-stayed cantilever assembly system of the main bridge of Mingzhu Bay Bridge in Guangzhou.The calculated stay forces were compared with the design and measured forces.The deformation of temporary towers after tensioning of the three layers of forestays and backstays was analyzed.The results demonstrate that the calculated stay forces generally close to the measured stay forces,but exceed the design stay forces,indicating a safety margin.The engineering practice proves the calculation accuracy and feasibility of the iterative calculation method.The calculated and measured displacements at control points met the code requirements,indicating that the structure has a safety margin.After the tensioning of the three layers of forestays and backstays,the temporary-tower-top displacements met the code requirements.The method can achieve main arch profile adjustment while ensuring the deformation of temporary towers to be within the allowable ranges.It is suggested to set a camber for the main arch at the design stage to ensure the alignment accuracy.
刊 名 桥梁建设 ISTICEIPKU
年,卷(期): 2026, 56(4)
分类号: U448.22 U445.46
机标分类号: U445 P228.4 TV672+.1