军事知识服务平台
高内压下储能洞室钢筋混凝土衬砌裂缝演化规律
摘要 为揭示高内压作用下压气储能地下洞室钢筋混凝土衬砌关键位置裂缝由起裂、扩展至贯通的全过程演化规律,建立基于零厚度内聚力单元的衬砌断裂分析模型,并结合衬砌模型试验对内聚力参数及裂缝宽度计算方法进行验证.模型采用二次名义应力准则判定裂缝起裂,采用 BK(Benzeggagh-Kenane)准则描述混合型断裂能演化.在此基础上,以某压气储能地下洞室为工程背景,分析衬砌典型方位潜在裂缝的起裂压力、贯通压力及裂缝宽度演化规律,并进一步研究侧压力系数和配筋率对衬砌断裂行为的影响.结果表明:1)模型试验中衬砌裂缝呈径向放射状发展,数值模型计算得到的起裂压力约为 0.19 MPa,与试验值 0.21 MPa 相差约 9.5%,裂缝宽度随内压增加的变化趋势与试验结果基本一致.2)在本文工程工况下,衬砌下盘中间位置的裂缝最早起裂,起裂压力为5.33 MPa,贯通压力为5.87 MPa;其余典型方位裂缝起裂压力为5.58~6.97 MPa,起裂后内压增加0.25~0.60 MPa 即可形成贯通裂缝;在13.00 MPa 内压作用下,最大裂缝宽度为0.44 mm,说明高内压下衬砌裂缝具有起裂后快速贯通和非线性张开的特征.3)侧压力系数可改变衬砌不同方位的裂缝发展规律,当侧压力系数接近于 1.0 时,衬砌受力较均匀,关键部位裂缝宽度较小.4)在本文工程条件下,配筋率提高至约 2.5%时,最大裂缝宽度可得到较为明显的控制,对于裂缝过宽部位,需采取额外措施进行加固处理.
Abstract:
To reveal the full-process evolution of cracks at critical locations in reinforced concrete linings of underground caverns for compressed air energy storage(CAES)under high internal pressure,from crack initiation and propagation to penetration,a lining fracture analysis model based on zero-thickness cohesive elements is established.The cohesive parameters and crack-width calculation method are validated through lining model tests.The quadratic nominal stress criterion is adopted to determine crack initiation,and the Benzeggagh-Kenane criterion is used to describe the evolution of mixed-mode fracture energy.Based on this model,a case study of an underground CAES cavern is conducted to analyze the crack initiation pressure,penetration pressure,and crack-width evolution at typical lining orientations.The effects of the lateral pressure coefficient and reinforcement ratio on the fracture behavior of the lining are further investigated.The results show the following:(1)The lining cracks propagated radially in the model test.The crack initiation pressure predicted by the numerical model was approximately 0.19 MPa,deviating by approximately 9.5%from the experimental value of 0.21 MPa.The variation in crack width with increasing internal pressure was basically consistent with the test results.(2)Under the characteristic engineering conditions considered in this study,cracks first initiated at the midpoint of the lower lining wall,with an initiation pressure of approximately 5.33 MPa and a penetration pressure of approximately 5.87 MPa.For cracks at other typical orientations,the initiation pressure ranged from 5.58 to 6.97 MPa.Through-cracks formed when the internal pressure increased by 0.25-0.60 MPa after crack initiation.At an internal pressure of 13.00 MPa,the maximum crack width reached 0.44 mm,indicating rapid crack penetration and nonlinear crack opening after initiation under high internal pressure.(3)The lateral pressure coefficient affected crack development at different lining orientations.When the lateral pressure coefficient was close to 1.0,the lining experienced a relatively uniform stress distribution,and crack widths at critical locations were small.Under the engineering conditions considered in this study,the maximum crack width could be significantly reduced by increasing the reinforcement ratio to approximately 2.5%.Additional reinforcement measures are still required in zones where cracks are excessively wide.
刊 名 隧道建设(中英文) ISTICPKU
年,卷(期): 2026, 46(10)
分类号: U45
机标分类号: U451.2 TV315 TU37
在线出版日期: 2026年11月9日
基金项目: 2024YFE0105800:国家重点研发计划U23B20145:国家自然科学基金52278402:国家自然科学基金DJ-HXGG-2023-09:中国电建集团核心攻关项目GJPY2026035:宁波大学高级别科技项目2025ZY01028:中央引导地方科技发展资金项目LQN25D020001:浙江省自然科学基金项目,