摘要
针对粉细砂地层中三管联排顶管顶进施工引起的土体变形问题,以三亚河口通道工程为背景,通过数值模拟方法研究不同含水率条件下土体的位移响应规律.研究结果表明:土体变形受含水率影响明显,当含水率为17.5%时,土体水平位移、地表沉降及地层隆起均最小,最大水平位移较 10%含水率工况降低 19.65%~19.85%,地表最大沉降降低 31.21%,表明该含水率下有利于提升粉细砂土体刚度与稳定性.水平位移极值出现在管节拱腰处,竖向沉降与隆起极值受截面影响位置不同,中间管轴线处最大变形位于管外一定距离,两管夹持区域最大变形紧贴管壁,表明三管联排顶管顶进时土体受挤压与扰动的复杂空间相互作用.顶进过程中存在明显的管土共同移动现象,机头后方约 0~6m 范围内土体随顶进向前移动,形成共同位移区,且位移量在含水率 17.5%时最小.数值模拟与现场监测的地表沉降整体规律一致,最大差值为 3.94mm,验证了数值模拟的合理性.
In response to the problem of soil deformation caused by three-pipe joint arrangement pipe jacking in fine-grained sand strata,using the Sanya Estuary Channel Project as a case study,this paper investigates the displacement response patterns of soil under different moisture content conditions through numerical simulation methods.The results indicate that soil deformation is significantly influenced by moisture content.When the moisture content is 17.5%,horizontal soil displacement,ground surface settlement,and stratum heave are all minimal.The maximum horizontal displacement is reduced by 19.65%to 19.85%compared to conditions with a moisture content of 10%,and maximum ground surface settlement is reduced by 31.21%,indicating that this moisture content is conducive to enhancing the stiffness and stability of fine-grained sandy soil.The maximum horizontal displacement occurs at the crown of the pipe segment,while the locations of maximum vertical settlement and heave vary depending on the cross-section.At the centerline of the middle pipe,the maximum deformation occurs at a certain distance from the pipe exterior,whereas in the area between the two pipes,the maximum deformation occurs immediately adjacent to the pipe wall.This indicates a complex spatial interaction between soil compression and disturbance during the thrusting of the three-pipe joint arrangement pipe jacking.A distinct phenomenon of pipe-soil co-movement is observed during the jacking process that within a range of approximately 0 to 6 meters behind the jacking head,the soil moves forward with the jacking,forming a co-displacement zone,with the displacement being minimal at a moisture content of 17.5%.The overall patterns of ground surface settlement from numerical simulations are consistent with those from field monitoring,with a maximum discrepancy of 3.94mm,thereby validating the rationality of the numerical simulations.