Study on hierarchical optimal scheduling and allocation of water resources based on water network topology
摘要
在水资源时空分布不均与高强度人类活动的共同影响下,区域供需矛盾日益突出,迫切需要开展依托水网工程体系的多目标优化调配研究以提升水安全保障能力.现有方法常将水网工程简化为增量水源参与配置,未充分考虑上游取水变化对下游水源条件的逐级影响.本研究通过融合水网"纲""目""结"的物理架构与"取—供—用—排"过程,构建水网拓扑递推计算模块,进而建立水资源分层调配模型,并以榆林市为例进行应用验证.结果表明:与基准年实际供水情况相比,优化调配方案在保障生态流量满足度为84%的前提下,使全市缺水率由 13.9%降低至 4.9%;在 2035年需水量增长超 90%的情景下,仍能够将南水北调西线建成前后的缺水率分别控制在 8.5%和 3.8%的较低水平.作为关键的跨流域调水工程,黑山峡水利枢纽陕西供水工程有效缓解了定边、靖边两地的地下水超采问题.水网分层调配模型能够充分发挥水网系统多源互补、丰枯互济的调控优势,在优先保障刚性需水的基础上实现弹性需水协同配置,实现了水库调度与水资源配置的一体化耦合,有效提高了系统的供水保障能力.研究结果可为水网精细化调配提供方法基础,并为面向实际水网运行的智能化调配提供技术支撑.
Under the combined influence of the uneven spatiotemporal distribution of water resources and intensive human activities,regional water supply-demand conflicts have become increasingly prominent,highlighting the urgent need for multi-objective optimal scheduling and allocation supported by water network infrastructure.Existing methods often treat water network projects merely as additional water sources,failing to fully consider the cascading effects of upstream withdrawals on downstream water availability.This study developed a water network topology recursive computation module in light of the physical architecture of the water network—"principal channels('Gang'in Chinese)","connecting branches('Mu'in Chinese)",and"control nodes('Jie'in Chinese)"—with the"water withdrawal-supply-use-drainage"process.On this basis,a hierarchical water resources scheduling and allocation model was established and then validated through a case study of Yulin city.The results show that,compared with the actual baseline water supply,the optimal scheme reduces the citywide water shortage rate from 13.9%to 4.9%,while maintaining an ecological flow satisfaction rate of 84%.Under a scenario where water demand increases by more than 90%by 2035,the water shortage rates are projected to remain at low levels—8.5%and 3.8%before and after the completion of the western route of the South-to-North Water Diversion Project,respectively.As a key inter-basin water transfer project,the Shaanxi Water Supply Project of the Heishanxia Hydro Complex can effectively alleviate groundwater overexploitation in Dingbian and Jingbian counties.The proposed model can fully leverage the regulatory advantages of the water network system—multi-source complementarity and mutual alleviation between wet and dry periods.By prioritizing rigid water demands while coordinating elastic water demands,it enables the integration of reservoir operation and water resources allocation,thereby improving water supply reliability.The findings can pro-vide a methodological basis for refined scheduling and allocation in water networks and offer technical support for intelligent operation oriented toward actual water network operation.