钻爆法隧道智能建造全景观测技术及数据底座构建方法
Panoramic observation technology and data infrastructure construction method for intelligent construction of drill-and-blast tunnels
摘要
针对钻爆法隧道施工环境封闭狭长、粉尘与光照干扰显著、设备遮挡频繁导致的过程数据连续性不足和关键事件缺失问题,提出面向智能建造的多视角全景观测与数据底座构建方法.基于设备组合、空间分布、部件状态和时序逻辑4类可观测特征,构建掌子面近景、高位全景与施工通道进出监控协同观测体系,建立"视频数据—设备对象—施工事件—工序状态"数据结构及统一事件编码规则,并在西渝高铁四方山隧道开展应用.结果表明:系统完成8个关键点位部署,全流程监控率达99.71%,有效帧率、时间同步合格率和关键对象可判识率分别为95.97%、100%和98.47%;基于连续观测数据可提取完整施工循环的工序边界及持续时间.
To address the insufficient continuity of process data and the loss of critical events caused by the con-fined and elongated environment,significant dust and lighting interference,and frequent equipment occlusion in drill-and-blast tunnel construction,a multi-view panoramic observation and data infrastructure construction method for intelligent construction is proposed.Based on four types of observable features,namely equipment configuration,spatial distribution,component status,and temporal logic,a coordinated observation system inte-grating close-range monitoring of the tunnel face,elevated panoramic monitoring,and access monitoring along the construction passage was established.A structured data framework of"video data—equipment objects—construc-tion events—process states"was developed,together with unified event coding rules.The proposed method was implemented in the Sifangshan Tunnel of the Xi'an—Chongqing High-Speed Railway.The results show that eight key monitoring points were deployed,achieving a full-process monitoring rate of 99.71%.The effective frame rate,time-synchronization qualification rate,and key-object recognizability rate reached 95.97%,100%,and 98.47%,respectively.The continuous observation data enabled the extraction of complete process boundaries and durations throughout individual construction cycles,providing a reliable data foundation for fine-grained process monitoring and intelligent construction management of drill-and-blast tunnels.
年,卷(期):
2026, 63(5)
分类号:
U451.2
机标分类号:
P315.61
U461.91
P152
在线出版日期:
2026年11月4日
基金项目:
2023YFB2603904:国家重点研发计划K25:中铁三局集团有限公司科技研发项目2025-122-006:贵州省交通运输厅重大科技攻关项目2026ZZTS0039:中南大学研究生自主探索创新项目,