Tellurium is a strategically scarce dispersed metal in China,with excellent photovoltaic,thermal conductivity and semiconductor properties.It is the core raw material for manufacturing photovoltaic cells,thermal sensitive components,high-end metallurgical alloys and chemical catalysts.With the rapid development of new energy and high-end new materials industries,the domestic supply-demand gap of tellurium resources has been continuously expanding,and the scarcity of resources has become increasingly prominent.In the copper hydrometallurgical industrial system,ice copper slag is a solid by-product with a large output.During the smelting process,most of the tellurium elements are concentrated in the ice copper slag.If it is directly buried or stored,it will not only cause the permanent loss of high-value tellurium resources,but also significantly reduce the comprehensive utilization rate of mineral resources.Moreover,due to the weathering and dissolution of heavy metals and valuable components in the waste residue,it will cause environmental pollution of the surrounding soil and groundwater,posing serious ecological hazards.Therefore,conducting research on the efficient extraction and recovery of tellurium from ice copper slag has important practical significance and engineering value for achieving the resource utilization and recycling of industrial solid waste,energy conservation and emission reduction,and alleviating the shortage of dispersed metal resources.This paper uses copper smelting waste ice copper slag as the test raw material and adopts an acid leaching-reduction combined process to recover the tellurium resources in the slag.The optimal parameter system of the wet extraction process is mainly explored.Through the single-factor variable method,the influence laws of five core process conditions,including acid concentration for leaching,reaction temperature,holding time,manganese dioxide oxidant addition amount,and liquid-solid volume ratio,on the leaching effect of tellurium were systematically studied.The various process parameters were precisely optimized.The test results show that the optimal extraction process conditions are:acid concentration of 8 mol·L-1,manganese dioxide addition amount of 0.30 g,liquid-solid ratio of 8:1 mL·g-1,reaction temperature of 40℃,and constant temperature leaching time of 30 min.Under this suitable condition,the leaching rate of tellurium in the ice copper slag is stable at 95.3%±0.1%,and the leaching effect is excellent.Subsequently,the high-purity leaching solution was treated by sodium sulfite for reduction purification,and the total recovery rate of tellurium was 93.40%.To clarify the phase structure and microscopic morphology of the reduction product,XRD analysis and SEM scanning electron microscope characterization tests were carried out on the obtained product.The test results show that the reduction product is elemental tellurium,with regular spherical particles,uniform dispersion,and no obvious agglomeration phenomenon.The characteristic diffraction peaks of the sample tellurium are sharp and highly identifiable,and are highly consistent with the standard elemental tellurium phase diagram.The product has high purity and good crystallization performance.The tellurium extraction process constructed in this study has the advantages of mild conditions,low energy consumption,high recovery rate,and excellent product quality.It effectively solves the problems of low efficiency and high impurity content in traditional waste residue tellurium extraction processes,and can provide solid experimental data and technical references for the green and efficient industrial recovery and utilization of rare earth metal tellurium in copper smelting waste residues.